Simple Guide to G98 Application for Solar Panel Connection in the UK
What is a G98 application?
G98 application is a guideline for connecting small-scale solar systems—those producing up to 3.68 kilowatts per phase—to the UK’s electrical grid. It’s mostly for straightforward, less complex installations.
Why Follow G98?
The rules ensure safe and efficient connection of your small solar system to the national electricity grid. It simplifies the process, avoiding lengthy applications.
Steps to Take:
- Installation: Set up your solar panels and start using them.
- Notification: Inform your local Distribution Network Operator (DNO) within 28 days after you start using your panels. This is the company that manages the electricity grid in your area.
- Documentation: Submit details about your installation, like system type and size.
Safety and Compliance:
- Protection: Your setup must have a safety switch to disconnect from the grid during power outages.
- Meet Standards: Your system should meet all local safety and technical standards to ensure it doesn’t disrupt the grid.
For Multiple Properties:
If you install systems on different properties close to each other within 28 days, there’s a specific process for that. You’ll need to provide more details to the DNO.
Benefits of Following G98:
This process is designed to make connecting your solar system to the grid straightforward and stress-free. It ensures that your system is safely integrated and operational without cumbersome approvals.
By understanding and adhering to G98 regulations, you can harness solar power efficiently and safely, contributing to sustainable energy solutions while ensuring compliance with local grid requirements. For more detailed guidelines, contacting your local DNO or a professional solar installer would be beneficial.
